SUPERCore Hybrid Laminate Installation Instructions
PLEASE READ ALL INSTRUCTIONS
CAREFULLY BEFORE YOU BEGIN
INSTALLATION. IMPROPER INSTALLATION WILL VOID WARRANTY
PREPARATION - Always check panels for defects such as chips and color or sheen differences under good light conditions. Also check that the channel is clean and free of debris. Always work out of multiple boxes to mix product to achieve randomized design.
Your laminate flooring MUST be allowed to acclimate to the environment of the installation area. Leave the closed packages in a horizontal position in the room for 48 hours priòr to installation. Preferable temperature should be approximately 17-23 C (62-73 F) with a relative humidity of 45-60 percent. Humidity should never be allowed to drop below 30% as this may cause gapping.
If existing baseboard moldings are difficult to remove, they may be left in place.
Quarter round molding is all that is needed to cover the expansion space between
TOOLS AND SUPPLIES REQUIRED ARE -
Foam underlay, pressure sensitive polypropylene adhesive tape such as Tuck Tape or equivalent, spacers, tapping block, pull bar, saw, hammer, utility knife, pencil, tape measure, ruler, construction adhesive.
If installing over a crawispace or on a concrete fioor, you must also install a 4 mil (or thicker) polyethylene vapor barrier under your foam underlay or use a convenient 2 in 1 foam underlay that has a vapor barrier built-in. When installing 2 in 1 foam underlay, butt seams and then completely seal seams using Tuck Tape
SUITABLE TYPES OF SUBFLOORS AND FLOOR PREPARATION
The underfloor or subfloor must be thoroughly even, dry, clean and solid. Carpet staples or glue residue must be removed and floor must be clean to ensure proper installation.
To check for evenness, hammer a nail into the center of the floor, Tie a string to the nail and push the knot against the floor. Pull the string tight to the farthest comer of the room and examine the floor at eye level for any gaps between the string and floor. Move the string around the perimeter of the room noting any gaps larger than 3mm (1/8*). Any floor unevenness of more than 3mm (1/8*) per 1 (3'2*) metre must be sanded down or filled in with an appropriate filler.
Floors must be carefully checked for moisture problems. Any moisture problems need to be solved before installation. New concrete needs to cure for at least 60 days before installation.
This product is not suitable for damp rooms such as bathrooms, saunas, rooms with damp concrete, rooms with floor drains or rooms that could potentially food.
For installation on concrete floors or any floors over a crawl space a vapor barrier
MUST be laid down first. Use 4 mil poly. Run the poly 5cm (2'7 up walls and overlap seams 45cm (18*). Tape seams.
BASIC INSTALLATION - Diagrams below...
All flooring installations require foam underlay. Run the foam underlay in the same direction as the laminate panels. Underlay should be butted side by side with no overlap. Tape seams together.
Diagram 1 - You will need to remove the tongue on the side of the panels that face the wall.
This is to ensure that the decorative surface of the laminate floor is well under the finished trim when installed. Use a utility knife to score through the tongue several times until it easily snaps off.
Start in a corner by placing the first panel with its trimmed side facing the wall. Use spacers along each wall to maintain an expansion space of 8-12mm (5/16*- 3/8*) between the wall and the flooring.
Diagram 2 - Remember that this product is primarily wood and needs room to expand and contract. At no point should you attach the floor to any surface.
To attach your second panel, insert the end tongue of the panel into the end groove of the first panel at a 45 angel. Lower the panel flat to the floor. Line up edges carefully.
Diagram 3 - Continue connecting the first row until you reach the last full panel. Fit the last panel by rotating the panel 180 with the pattern side upward, place beside row, mark and saw off excess. Altach as described above.
Diagram 4 - When using a handsaw cut on the decorative surface. If you use a jig or circular saw cut with the decorative side down to avoid chipping.
Diagram 5 - Begin the next row with the off cut piece from the previous row to stagger the pattern. Pieces should be a minimum of 20cm (8) long and joint offset should be at least 40cm (16*).
Diagram 6 -To start your second row, Push the side tongue of the panel into the side groove of the very first panel at about 45. When lowered, the plank will click into place.
Diagram 7 - Attach the second panel of the new row on the long side as described above.
Push this panel as close as possible to the previous row. To attach this second panel to the previous panel, tap the end using a tapping block and rubber mallet.
Continue along in the same fashion.
Diagram 8/9 - To fit the last row, lay a panel on top of the previous row. With the tongue to the wall, lay another panel upside down on the one to be measured and use it as a ruler. Don't forget to allow room for spacers. Cut the panel and attach into position.
Diagram 10 - Door frames and heating vents also require expansion room. First cut the panel to the correct length. Then place the cut panel next to its actual position and use a ruler to measure the areas to be cut out and mark them. Cut out the marked points allowing the necessary expansion distance on each side.
Diagram 11 - You can trim door frames by turning a panel upside down and using a handsaw to cut away the necessary height so that panels slide easily under the frames.
Diagram 12 - Remove spacers and you are ready to install finishing molding.
-
Free SUPERCore Samples
Order 5 free SUPERCore flooring samples to see how our floors look in your home.
-
BEST Price Guarantee
To guarantee you get the BEST price, we'll work to beat any competitor's pricing.
-
Flooring Questions
Want to speak to us about your project? Text us below or call 844-356-6711